Michael Shanks MP: speeches

892 published records · newest first.

Speeches

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    No, I will respond to that point, if I may. I respect the view of the Conservative party and the argument that Conservative Members are making. I completely understand it, but I am trying to make the point gently that this is not about our directing specific decisions that will be made by Scottish Ministers. It is about how—in this case, as it is across wayleave applications in England and Wales as well—fees will be charged on a cost recovery basis in line with UK and Scottish Government policy on managing public money.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    Clause 20 creates a power for the Secretary of State or Scottish Ministers to make limited procedural amendments to the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017, which for ease of reference I will refer to as the EIA regulations. As part of the consenting process for electricity infrastructure in Scotland, Scottish Ministers are required to assess the likely significant environmental effects arising from a proposed EIA development. Before the UK left the European Union, Scottish Ministers and UK Government Ministers had concurrent powers, under the European Communities Act 1972, to make regulations for electricity works EIAs. However, although the EIA regulations remained in force as assimilated law after the European Communities Act was repealed, the result is that neither Government have the power to amend them.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    Clause 16 amends section 36D of the Electricity Act 1989, which provides for a statutory appeal to be brought by any person who is aggrieved by a decision made by Scottish Ministers—perhaps the shadow Minister. A challenge to an offshore electricity infrastructure consenting decision made under section 36 is by statutory appeal. The clause extends this, so that statutory appeal also applies to onshore electricity infrastructure consenting decisions made under section 36, decisions made under section 37 and all variation decisions. The clause will create consistency in Scotland by making the challenge process the same for both onshore and offshore consents, and ensuring they are brought in a timely manner. A challenge will have to be brought within six weeks for onshore consents, as is already the case for offshore consents. This will bring the timescale for challenging large electricity infrastructure decisions into alignment right across Great Britain. Clause 16 also amends the Electricity Act so that the six-week timescale for bringing a challenge commences from the publication of the decision by the Scottish Minister, instead of the date on which the decision was taken. This is a new requirement for both onshore and offshore, and is compliant with the Aarhus convention compliance committee’s recommendations relating to the timescale for challenging planning decisions. There is also a consequential amendment to the Town and Country Planning (Scotland) Act 1997 in respect of directions relating to deemed planning permission. I commend the clause to the Committee.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    No, I will carry on answering this point, if that is okay. We are very enthusiastic about clause 17—who would have thought it? To be clear about this point—I feel as if I am the only Scottish MP on this Committee, but I am not—when this Government increase spending in a particular area, that results in a budget transfer to the Scottish Government, the Welsh Government and the Northern Irish Executive, which they can spend on whatever they see as their local priorities. An increase in NHS spending in England does not lead to the exact same in Scotland. We will not bind the hands of every single decision that is made in this case. This is about conferring a power on Scottish Government Ministers to set and charge fees to electricity network operators for necessary wayleave applications in Scotland.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    Amendment 84, tabled by the hon. Member for Gordon and Buchan (Harriet Cross), concerns public consultations under sections 36 and 37 of the Electricity Act 1989. It is worth making it clear that the planning systems of Scotland and of England and Wales are very different, and the starting points are very different. The 1989 Act—which we will come to shortly, in relation to the necessary updates to consents more widely—provides for the process of notification and objection at the application stage. This is very different from aspects of the planning regulations in England and Wales, in that there are already opportunities for consultations, but clause 14 creates a further power to make regulations to set out such matters relating to applications for consent, including a pre-application consultation requirement. That requirement will be set out in regulations rather than in primary legislation, but its purpose is to ensure that the application is proportionate, adaptable and future-proofed. As much as I politically disagree with the incumbent Scottish Government, we have been working together incredibly effectively, since we came into government, on some key aspects. The reforms of the 1989 Act are a good example. To take the earlier point about the changing energy system, that Act was legislation for a different time, and the planning system in Scotland has not kept pace with the reforms in the rest of the United Kingdom. The reforms that we are proposing give Scottish Ministers a framework to introduce regulations to allow for a pre-application consultation process, and to give both communities and statutory consultees meaningful opportunities to influence applications and have a voice early in the process. For that reason, I see much of amendment 84 as replicating provisions already in the Bills, so I hope the hon. Member for Hamble Valley will withdraw it.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    I thank the hon. Gentleman for those helpful questions. He rightly set out the fact that the grid is already considerably more complex than it was 20 or 30 years ago, and it will become more complex, which is partly why the reform of connections is so important. The hon. Gentleman is right to say that the process of prioritising projects will mean that some will be deprioritised. We have looked at the projects that already have a connection date, and in many cases they will proceed. Viable generation projects above the capacity ranges outlined in the clean power action plan—the first strategic document that will be used to guide projects—might still be able to connect if there is capacity in that particular bit of the DNO after the prioritised projects have been assessed. If there is no space in the pre-2030 queue, they will be offered dates in the 2031-35 process. We have been clear throughout that the process has not been arbitrary or theoretical. Ofgem and NESO have gone through individual applications that are currently in the process to make sure not only that they fit with the requirements of the clean power action plan but that projects are not unnecessarily disadvantaged. Some projects will go ahead even though they are not in the strategic plan, because where they already are in the grid will make it possible for them to go ahead. The question of transparency is really important. I will come back to the Committee with details on how we might make the information public, but throughout the process Ofgem and NESO have made public as much information as possible about how they have gone about things, and there was a full public consultation as well. The point about how individual MPs can see whether projects in their constituency are affected is well made and I will take that away and reflect on it. The critical fact, as the previous Government rightly recognised, is that 750-plus GW is simply unmanageable. Really good projects are sitting with dates long into the future but cannot connect because of what are often phantom projects that are never going to come to fruition and are holding up spaces in the queue. For all the reasons that the hon. Gentleman outlined in terms of the importance of energy security, and the importance of prioritising the queue, we think that the Government amendments and the clause are essential. Amendment 41 agreed to. Amendments made: 42, in clause 12, page 16, line 17, leave out “as mentioned in subsection (1)(c)” and insert “in accordance with the conditions of an electricity licence”. This amendment is consequential on amendment 41. Amendment 43, in clause 12, page 16, line 22, after “distribution system” insert “(and such an improvement may include changing the order in which connections are made)”. This amendment clarifies that the purpose for which a direction may be given under clause 12 may include the making of changes to the order of the queue for connections to a transmission or distribution system. Amendment 44, in clause 12, page 16, line 23, leave out subsections (4) and (5) and insert— “( ) A direction under subsection (2) must describe the kinds of modification to be made by the person to whom it is given.” This amendment inserts a new subsection which would mean that a direction made by the Secretary of State or the GEMA to the ISO P or an electricity distributor to modify an agreement must describe the kinds of modification required. Amendment 45, in clause 12, page 16, line 38, at end insert— “(7A) Before giving a direction under subsection (2), the relevant authority must consult— (a) the person to whom it proposes to give the direction, and (b) such other persons as the relevant authority considers appropriate. (7B) Subsection (7A) may be satisfied by consultation carried out before the passing of this Act (as well as by consultation carried out after that time). (7C) A relevant authority must publish details of any direction it gives under subsection (2) as soon as reasonably practicable after the direction is given. (7D) A relevant authority may exclude from publication under subsection (7C) any information the publication of which would be likely to prejudice the commercial interests of any person.” This amendment requires a relevant authority to carry out consultation before giving a direction under clause 12. It also requires a relevant authority to publish any direction it gives under the clause. Amendment 46, in clause 12, page 16, line 41, at end insert— “(8A) The power to give a direction under subsection (2) may not be exercised after the end of the period of three years beginning with the day on which this section comes into force.” This amendment ensures that the power to give a direction under clause 12 is time-limited in the same way as the power to make modifications to licences and other documents under clause 9. Amendment 47, in clause 12, page 17, line 10, at end insert— “(11) In Schedule 6A to the Electricity Act 1989 (provisions imposing obligations enforceable as relevant requirements)— (a) in paragraph 4A (electricity system operator), after sub-paragraph (c) insert— ‘(d) section 12(8) of the Planning and Infrastructure Act 2025 (duty to comply with direction under section 12 of that Act).’; (b) in paragraph 5 (distribution licence holders), after sub-paragraph (g) insert— ‘(h) section 12(8) of the Planning and Infrastructure Act 2025 (duty to comply with direction under section 12 of that Act).’” —(Michael Shanks.) This amendment amends Schedule 6A to the Electricity Act 1989 in order to provide for enforcement of the duty to comply with a direction given under clause 12. Clause 12, as amended, ordered to stand part of the Bill. Clause 13 Managing connections to the network: strategic plans etc Question proposed, That the clause stand part of the Bill.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    In a very different system.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    I thank the shadow Minister for the way he is discussing these topics. I appreciate that they are from a planning system alien to the one with which he is, I am sure, very familiar—I am tempted to say that the shadow Energy Secretary could join him on the Bench, but he is not here. I understand the point that the shadow Minister is making. For hon. Members who are not familiar with the Scottish system, a public inquiry can be triggered with one objection into the planning system. The public inquiry can take years to conclude and often is not reflective of actual community sentiment on a particular project. This system does not exist in any form anywhere else in the UK. The purpose of these consenting reforms is to deliver significant efficiencies in the consenting process, and to make decisions faster—not necessarily to make positive decisions faster, just to make decisions faster. Introducing another element that feels like the element that we are removing takes away from that. As I have said previously, there are still significant opportunities for communities to participate in the process. One of the key aspects that we are introducing is the right of a reporter, who is an experienced specialist in planning and consenting, to consider representations about whether there should be a public hearing on a particular process. That reporter will then make the decision about whether it should go forward into a hearing session or a public inquiry. That is rather than what we have at the moment, which is an automatic trigger that holds up projects for a significant length of time. I am always happy to meet with the shadow Scottish Secretary on a range of things. I am happy to engage with him, because I appreciate that his part of Scotland has a significant amount of network infrastructure being built; but for the reasons I have outlined, this amendment goes counter to our objectives, and does not sit with the reforms we are making to the Scottish planning system, as distinct from the planning system in England and Wales.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    I will first respond to a few points in the debate generally. My hon. Friend the Member for Glasgow East—across the Clyde from my constituency—made the absolutely right point that sums up what this connections reform process is all about: the absence of reforming the queue is driving away investment. Reform is critical for investment in our generation capacity and for how we connect demand projects that will be so important for unlocking economic growth. With more than 750 gigawatts currently in the queue to connect in the UK, the truth is there is no scope for that to happen without some radical reform of the queue. The Conservative party, when in government, recognised that that was a challenge and had already set about some reforms to make that happen. We think we need to go even further. The shadow Minister, in a ray of honesty, said he was glad he was not the shadow Energy Minister. Based on the script on net zero, I think we are all fortunate that he is not the shadow Energy Minister, frankly, but it is the same script we are hearing from everyone at the moment.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    I beg to move amendment 36, in clause 9, page 14, line 6, after “distribution system” insert “(and such an improvement may include changing the order in which connections are made)”. This amendment clarifies that the purpose for which the power under clause 9(1) may be exercised may include the making of changes to the order of the queue for connections to a transmission or distribution system.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    I have not had the conversation. I am happy to have it, but the tone will not be, “Here are my expectations of you as a democratically elected Member of the Scottish Parliament accountable to a Parliament I do not sit in.” I do not know how familiar the shadow Minister is with the devolution legislation in the United Kingdom, but I gently say that this Parliament gives the devolved Administrations power to raise a whole series of taxes, charges, levies, fines and various other things. We give that power to those devolved assemblies; we do not then tell them exactly how to spend every single penny of that money. This is another example of that. It is a perfectly common thing in the devolution settlement.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    Thank you, Mr Twigg. That is helpful.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    No, we have not. A series of work will be necessary to come up with that figure, because the fees will be charged on a cost recovery basis. It is not a money-making exercise for the Government. That is in line with approaches in the rest of Great Britain. There will clearly be a significant number of such applications in the coming years—more than in previous years, probably—but the detail will be worked out with the Scottish Government. We do not know in advance exactly how many wayleave applications there might be, so we cannot give an exact figure.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    Will the hon. Gentleman give way?

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    Gordon and Buchan.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    Both.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    I agree.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    The shadow Minister is introducing the best example I have heard in a long time of the West Lothian question. The fundamental thing is that this is not a political question about the Scottish Government or the UK Government. There are reserved matters for which this Parliament is responsible for holding UK Government Ministers to account, and there are devolved matters that Scottish Ministers have responsibility for delivering and the Scottish Parliament is responsible for holding them to account for. It would ride roughshod over this Parliament’s fairly consistent support of devolution in the UK for us to now suddenly say that those Scottish Ministers are also accountable to another Parliament. I think that we agree on the nature of devolution in this country, although we may strongly disagree on the actions that devolved Governments take, but we cannot support the new clauses, for the reasons I have outlined. This is not about thinking outside the box; it is about recognising the role that the devolved system plays in our constitution. For those reasons, I will resist the new clauses.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    Perhaps I misunderstood the hon. Gentleman’s point, but I think that amendment 80 was about forcing Scottish Government Ministers to spend funds on community benefits and other things. This clause is saying that the Government will have the power to raise application fees if they choose to do so. Of course, they could choose not to, but under this clause they will have the power to raise them.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    It’s the same thing.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    In general, I agree and disagree with the hon. Gentleman’s point. I understand the point he is making about consistency, but I take the view that the whole purpose of having different devolved Administrations in England, Wales and Scotland is to make different decisions. Northern Ireland is separate in the energy discussion, because it has a separate grid. I am not sure that I would say that consistency at all costs is the right approach. We created the Scottish Parliament and the Welsh Assembly so that they could make decisions locally that affected them in a different way. We have worked with the Scottish Government on these changes to make sure that there is a package of reforms to the consent arrangements under the Energy Act that relates to the planning system in Scotland as it currently is. It is not the same starting point as the system in England and Wales, so it is important to look at them separately. Nevertheless, I understand the hon. Gentleman’s point. I return to clause 17. Fees are already charged in England and Wales for processing wayleave applications. I reiterate—this comes back to the point made by the hon. Member for Broxbourne—that the Scottish Government do not have the power in legislation to raise those fees. That power is reserved. The clause will give them that power.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    There is always a quote, as they say, and my hon. Friend is always there with the quotes at his fingertips, which is helpful. The truth is that the only way we are going to bring down bills and deliver energy security is the sprint to clean power. This is a crucial element of that, and of how we unlock investment—predominantly private investment—over the next few years as we build that clean power system. Even if we were not doing that, the grid is essential. It is an essential part of how we deliver electricity to homes, businesses and industry and it is critical that we upgrade it anyway.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    I will begin with a brief explanation as to why clause 14 should stand part of the Bill. I return to the point that my hon. Friend the Member for Glasgow East made a moment ago, and one that I have made before, which is that these reforms were in the pipeline under the previous Government. They are reforms to a long-standing piece of legislation that is long due for updating. I thank officials in my Department and in the Scottish Government for working closely and at speed, with a similar set of objectives and an open-book approach to making this work, to draft the measures in a way that works for all of us. It is a reset of the tone of how we work as two Governments. On enabling the introduction of pre-application requirements, as the hon. Member for Hamble Valley referenced, in the Scottish legislation there are currently no steps to give the public an opportunity to engage as there are in the NSIP regime in England and Wales. This is about improving the quality and readiness of applications at the submission stage. It is important to say that this was driven by the views of Scottish Ministers, who said that they thought it was a useful process, but it will be directed in detail in regulations so that it can be updated and adapted to situations, unlike the process that we have in England and Wales at the moment, which has been held back and has added time and complexity to projects and not delivered what it was intended to do. It will give Scottish Ministers the powers to charge fees for pre-application services, enabling them to better support applicants in developing good-quality applications. Secondly, the clause establishes a power to set time limits through regulations for key stages of the consenting process, which will support the timely determination of applications and bring down overall processing times. Thirdly, it will establish a proportionate process for responding to objections by relevant planning authorities through a reporter-led examination process. The reporter will choose the most appropriate procedure for gathering any further information they need to provide recommendations in a final report to Scottish Ministers. That may include inquiry sessions, where the reporter considers that that is the best approach to take to address particular issues. Such an approach is similar to the well-established process in which appeals in the town and country planning decisions are currently addressed. Clause 15 enables regulations to be made that prescribe new processes to vary electricity infrastructure consents in Scotland after they have been granted. The clause addresses the current anomaly that there is no prescribed procedure for holders of overhead line consents to apply to Scottish Ministers for a variation to their consents. The current position forces consent holders to make full consent applications in order to authorise often very modest variations. The clause also allows Scottish Ministers to vary an existing generating station or overhead lines consent due to changes in environmental circumstances or technological changes. Such variations will be made with the agreement of the consent holder. Finally, the clause allows Scottish Ministers to correct any errors or omissions made in consents for generating stations or overhead lines. I will come back to the new clauses later, but I want first to underline the importance of the consenting process. In Scotland, we generate a significant amount of electricity, and there are further projects in the pipeline, including both floating offshore wind and onshore wind. It is critical that there is an off-taker for that power in the rest of the UK, and that requires us to build significantly more network infrastructure to bring that clean power to where it is required. Although these changes to consenting relate to Scotland, they are of critical importance for the energy security of the whole United Kingdom.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    I do not disagree with a single thing that the hon. Gentleman has just said, but it is not for me to dictate to the Scottish Government. They are democratically elected, and as much as I may disagree with much of what they do, they are none the less the Government of Scotland, and if they want to ringfence funding for a particular part of the process, they should be able to do so. In particular, diverting any funding away from the more speedy processing of planning applications would not be in the interests of the projects we want taken forwards. It is not that I disagree with him, but this is a devolved competence.

  • 29 Apr 2025 · Planning and Infrastructure Bill (Fourth sitting) · Hansard source
    More

    I beg to move amendment 41, in clause 12, page 16, line 8, leave out subsection (1). The effect of this amendment is that a relevant authority may give a direction under clause 12 without first having exercised its powers under clause 9(1) to modify an electricity licence or an electricity industry code.

Published records only — not a full account of an MP’s work. How we work →