  • 15 Jul 2026 · Peak Cluster Pipeline and Project · Hansard source
    More

    I am aware of that. Councils can take a view on a whole range of things; I do not think there is anything controversial about a council making its views known on a particular project. It is very welcome to do that, and that is why we have democratically elected councillors in this country. On a final point by the right hon. Lady and others about Government funding for this project, she draws a connection between the investment of the National Wealth Fund and the fact that it is wholly owned by the Government. I understand the connection, but equally, it is not correct to say that that represents financial support from my Department or the Government for a project. The National Wealth Fund was set up to provide investment for important infrastructure projects, and it makes its decisions independently from Government. I have not seen or signed off any funding applications for the Peak Cluster pipeline and nor have any Ministers. The NWF makes those decisions on its own framework, as set out by the Treasury and Parliament. It should not be taken as any indication of my Department’s support or otherwise for a particular project.

  • 15 Jul 2026 · Peak Cluster Pipeline and Project · Hansard source
    More

    The principle of the National Wealth Fund is that we can make financial investments in projects. In some of those cases, that means taking an equity stake. Sometimes it does not, but sometimes it does. The National Wealth Fund has been around for long enough now; I am sure Members are aware of it. I will close with something that, in part, reflects what Members said in the Adjournment debate secured by the hon. Member for Chester South and Eddisbury. Any large-scale infrastructure project comes with concerns from local communities, and it is right and proper that such communities voice those concerns in any way they can. That has to be a respectful exchange of views, which has not always been the case thus far, but I understand the strength of feeling on this—it is absolutely understandable. The exchange of views is important, and everyone, whether or not they are listening to this debate, should know that the Government take community engagement very seriously. We expect to see meaningful engagement with communities, but at the same time the Government have set out an ambitious plan to decarbonise our economy. That is important for a whole range of reasons, but it is also a hugely important economic opportunity for us as a country. Decarbonising hard-to-abate sectors such as cement and lime, which are critical to our economy, is difficult. CCUS is a route to doing that. It is essential not only for meeting our climate commitments, but for the economic opportunities that it offers. Future project proposals are subject to scrutiny, high standards and a tough regulatory regime. The Government will look at all of this in the round in terms of individual projects. I repeat the point that I made at the beginning: this is not a project that the Government are driving forward, and it is not a project that we are saying we do or do not support, because at this point in time no proposal has come before us to do that. In due course, we will do that. In the meantime, I encourage everyone in the local community, Members of Parliament, the Peak Cluster itself and others to engage with the process.

  • 15 Jul 2026 · Peak Cluster Pipeline and Project · Hansard source
    More

    Let me respond to the right hon. Lady’s points. She has now accused me twice in this House of being “elusive” and of “obfuscation”. I have answered every single one of her written parliamentary questions. I am not responsible for the fact that she may or may not like the answers I give, but I have answered every single one of her questions, and I responded to her point of order in the main Chamber. I resent the implication that I have not done that, because I take my responsibilities to Parliament very seriously. First, I will come back a little from the Peak Cluster itself to make some points about why carbon capture is important. I say that partly because carbon capture technology has been around a long time. The previous Government, in which the right hon. Lady served in various ministerial roles, drove forward investment in carbon capture, which we have continued. This is not something that just appeared in July last year; it is a technology that Governments have recognised will play an important part in decarbonising our energy system. This technology is also important for particular parts of our industry, which are now competing against imports from other parts of Europe that utilise carbon capture, usage and storage. Cement is one example that the Peak Cluster project is looking at, but we are taking forward other important clusters, such as the Viking and Acorn clusters, that the previous Conservative Government supported. Decarbonising cement might not seem like a particularly important topic to a lot of people, but it is actually critical. Around 40% of UK cement and lime production takes place in Derbyshire and Staffordshire. Cement is one of the foundational heavy industries, and one of our most important substances, to underpin growth in our economy. As a result, the industry was recognised in the industrial strategy as a foundational input for growth. It is also an economically important sector, contributing around £350 million in gross value added and supporting thousands of jobs. The challenge we have is future-proofing the industry. A number of businesses now want to buy low-carbon cement to construct their projects, but low-carbon cement is produced elsewhere in the world, so it is important to find ways to be competitive in that market. As I said in the Adjournment debate, other technologies for creating low-carbon cement exist, but they are not yet at a stage where they can be deployed at scale. Carbon capture is important, and there is no route to net zero that does not involve this technology. I want to remind the right hon. Member for Tatton why net zero is important, although I know that not everyone will agree. Given that we are living through climate change on such a scale, we as a country should be taking our responsibility seriously to do everything we can, and this is an important part of how we tackle it. This is also an economic opportunity that not only creates thousands of jobs in carbon capture but protects thousands of jobs in the heavy industry that we do not want to see leaving this country to go elsewhere. It plays a strategically important part, along with our economic growth and industrial strategy, in how we will broadly deliver net zero. Before I address some of the right hon. Lady’s points on the Peak Cluster, I want to repeat a point I made in the Adjournment debate about the voice of local communities, which is one that she also rightly made. She made a point about the nationally significant infrastructure project regime, which I want to clarify. Perhaps I misunderstood, but I think she was trying to suggest that the Government have somehow contrived for the Secretary of State to make a decision on a particular project. The NSIP regime exists—indeed, it existed under the previous Conservative Government—to recognise that there are some projects of such a scale that local councils cannot individually decide on them, so they should be decided on at a national level. That is a process that has been undertaken for many years. I want to be really clear, however, that that recognition does not suggest, in any way, that there will be a particular outcome from the process. Not only has there been no decision from Government on this project, but it has not even been submitted for a decision at this stage. It is a long way from that process.

  • 15 Jul 2026 · Peak Cluster Pipeline and Project · Hansard source
    More

    I am just rounding up. In the end, I hope that we will come to a view where communities feel they have been heard and where projects can move forward on their individual merits. That will be part of the process when we come to it. Question put and agreed to .

  • 15 Jul 2026 · Peak Cluster Pipeline and Project · Hansard source
    More

    That is not what I said at all, Sir Roger. The debate has been perfectly in order, but I do not think the public watching will have got much from it. That is my assessment and, I am sure, the assessment of many others watching. As I was saying, I encourage the right hon. Lady, if she did not see the recent debate on this topic, to look at the remarks by her hon. Friend the Member for Chester South and Eddisbury, who rightly raised concerns about local communities, but in a way that was, I think, based slightly more in fact than in rhetoric. I will come to the right hon. Lady’s questions.

  • 15 Jul 2026 · Peak Cluster Pipeline and Project · Hansard source
    More

    My hon. Friend is absolutely right, and that was the point I was going to come on to. Community engagement is absolutely critical. It is an absolutely firm expectation from Ministers that any of these large-scale infrastructure projects should have meaningful engagement with communities. However, it is also absolutely critical for any project that wants to succeed in the NSIP process to demonstrate not only that it has carried out consultation but that that consultation has had a meaningful impact on the shaping of the project. That is one of the key factors in decision making in NSIP applications. I want to echo a point that was made in the Adjournment debate on this subject and that many Members have raised with me outside of debates in Parliament, which is about the need for extensive consultation on this particular project. Criticisms have been levelled at the Peak Cluster project that its consultation with communities has not yet been good enough. I understand that it is planning to do more, but it is not for me to direct it to do that. It must engage meaningfully with communities because, once a proposal has been submitted, if community engagement has not been meaningful, that will count against the project. There is a wider argument here about principle. The Government have said from day one of coming into office that it is important that we build things as a country again and that we do not become a country that just spends decades talking about important infrastructure but never builds it. However, that building should never be done without proper engagement with communities, which means communities feeling that they have had their say and that their say has been listened to. This project is one example of where much more consultation has to happen.

  • 15 Jul 2026 · Peak Cluster Pipeline and Project · Hansard source
    More

    I think I just said that the nationally significant infrastructure project regime exists so that decisions can be made at a national level by different Secretaries of State. In this case, it is an energy project, so yes, the decision will be made by the Secretary of State for Energy. The right hon. Lady seems to be implying that there is somehow a predetermined outcome, but the application has not even been submitted for consideration, so I do not think that is a sensible position to take. The right hon. Lady also cast aspersions on the North Sea Transition Authority, which is an independent regulator. It was the Oil and Gas Authority for many years; it is now the North Sea Transition Authority. It has operated under Governments of all political persuasions to make decisions about how we steward the North sea licensing regime not only for oil and gas but, increasingly, for carbon capture. It makes those decisions independently of Government; Ministers do not interfere in the decision making of the NSTA. Again, she seems to be drawing conclusions about an independent regulator that are neither fair on the regulator nor accurate in fact.

  • 15 Jul 2026 · Peak Cluster Pipeline and Project · Hansard source
    More

    No, I will not just now, because the right hon. Lady has just given a speech. I will respond to some of her points.

  • 15 Jul 2026 · Peak Cluster Pipeline and Project · Hansard source
    More

    It is a pleasure to serve under your chairship, Sir Roger, although the debate has probably not been conducted in the best way to discuss this topic. I draw the attention of the right hon. Member for Tatton (Esther McVey) to the recent Adjournment debate secured by her colleague the hon. Member for Chester South and Eddisbury (Aphra Brandreth), which I think she was unable to attend.

  • 15 Jul 2026 · Peak Cluster Pipeline and Project · Hansard source
    More

    I will give way in just a second. The right hon. Lady’s point about the NSIP regime was quite wrong. Decisions are made based on applications that are submitted, but no application has been submitted. They are based on all the facts, including the community engagement that takes place—I will come back to that after I have given way. Applications must demonstrate genuine community engagement and learning from the views of communities; it is not just a listening exercise but a shaping exercise, and that has not yet concluded.

  • 15 Jul 2026 · Peak Cluster Pipeline and Project · Hansard source
    More

    First, on the point about this somehow being a Government project, it is absolutely not. That is why my answers to the right hon. Member for Tatton reflected the fact that, right now, private developers across the country in a whole range of sectors are developing private propositions for all sorts of things. Until those proposals come to Government, either with a request for funding or as part of the NSIP regime, the Government do not have a view on whether they are Government projects or not. They are not delivered by Government; they are private investments and therefore it is for those companies to put forward their proposition. The Government will then take a view on it, as we do with all nationally significant infrastructure projects. That is the first point about this being a Government project, which it is absolutely not. Peak Cluster is also not one of the clusters that the Government have initially taken forward. We are taking forward two clusters initially to drive carbon capture and storage; the Peak Cluster is not one of them. I make that point again on the record. My hon. Friend the Member for Mid Cheshire (Andrew Cooper) made a second point about safety. It is really important to say that carbon capture and storage is not a new technology; it has been tried and tested, across industry and across power generation at scale, for a long time. Geological carbon dioxide storage has been in operation for decades. Norway has stored CO 2 since 1996—it has stored over 20 million tonnes of it so far—and a safe and robust regulatory regime exists precisely to ensure that safety standards are as high as they possibly can be. Safety will be at the forefront of any decision about how we take this project forward. It is absolutely critical but, as I have said, CCS is not some novel technology whose safety considerations we do not understand. It is managed, understood and regulated effectively at the moment.

  • 8 Jul 2026 · Greenhouse Gas Removals Sector · Hansard source
    More

    May I congratulate the hon. Member for West Dorset (Edward Morello) on securing a debate on this important topic? I thank him for all his engagement on this and many other issues, and for his leadership on the energy transition. In the rising noise in and outside this place against facts on the climate crisis in front of us today, it is genuinely a relief to have conversations with him about what we can do about the reality. On that, he makes a hugely important contribution to the House. In all my engagements with him, I come away having learned something new; I thank him for that. I will start where the hon. Gentleman started: by recognising that we cannot put off our response to the climate crisis to tomorrow. We are now living through extremely hot weather caused in part by the action that we did not take to tackle the climate crisis. While this is one of the hottest summers that we have lived through, it is almost certainly one of the coldest summers that we will live through, so every single step we can take to tackle this crisis should be taken. We absolutely need greenhouse gas removal technologies to reach net zero and to tackle the climate crisis. Such technologies give us a not just a huge opportunity to balance the residual emissions from hard-to-decarbonise sectors, but—as we have said throughout all of the work the Government are doing on the clean power mission and beyond—an exciting opportunity to grow our economy and secure new investment into the UK. When I say that, I mean all parts of the UK, including Northern Ireland, which the hon. Member for Strangford (Jim Shannon) rightly always challenges me on. This is not just the Government’s view; it is firmly the view of the Intergovernmental Panel on Climate Change and our own independent Climate Change Committee. That is why we are looking ahead and investing in these technologies. Last year, in our carbon budget and growth delivery plan, we set out how the UK will continue to reduce emissions in a way that lowers bills and secures good jobs, including developing and deploying GGRs at scale. We forecast 0.7 megatonnes of engineered GGRs deployed in 2030, with that figure increasing exponentially to 21.8 megatonnes by 2035. We are laying the groundwork now to support the massive growth that we expect to see in the 2030s, because, as exciting as these technologies are, they are new, and it will take a comprehensive and holistic policy framework to get us to where we need to be. I will set out six steps, many of which will respond to the points made by the hon. Gentleman. The first is providing support to incentivise private investment through a contractual revenue support mechanism. That is the GGR business model, designed to stimulate private investment in GGRs by providing revenue support under a contract for difference mechanism. It aims to capitalise on growing demand for high integrity GGRs in the voluntary carbon market and, in the longer term, in the UK emissions trading scheme, designed to enable the deployment of GGR projects at scale in the UK while ensuring at all times value for money for taxpayers. We are employing similar approaches to support energy from waste, with carbon capture and storage through the waste industrial carbon capture business model and large-scale bioenergy with carbon capture and storage, or BECCS, through our power BECCS business model. We are also exploring the case for financing GGR technologies not reliant on CO 2 transport and storage infrastructure, such as enhanced rock weathering and CO 2 mineralisation in building materials, as we recognise that there are a number of benefits to a diverse portfolio of GGR technologies. No decisions have been made on the particular intervention or mechanism. I want to reference the point that the hon. Gentleman has raised with me before and he raised today as well on the British carbon bank, or the idea of some kind of revolving fund. It is a serious idea that we will look at carefully, because we recognise that there is a real benefit to having that portfolio in place. We have already invested money, as I will come on to, but looking at interventions like that is important. We will continue to engage with him and the wider sector on how that could work. Secondly, we are introducing a new standard to ensure that investors and the public have confidence in these technologies. To complement the business models, we have commissioned the British Standards Institution to develop methodologies under an official UK GGR standard, and that is expected to be published next year. This is about making sure that carbon removals are genuine and verifiable, and having a standard in place so that we can objectively assess the viability and suitability of projects applying to the business model. The BSI development process generates high-integrity standards and benchmarks, bringing together industry specialists, academics and policymakers from across relevant sectors to produce a consensus-based final product. It is an example of a strong point made by the hon. Gentleman: everything we need to make this work is already here in Britain. The academics, the industry specialists, the skills and the capabilities are all here, and we just need to look at how we capitalise on those resources as quickly as possible. Thirdly, we know that carbon capture, usage and storage infrastructure is critical for enabling some of these technologies, and we have been committed to deploying CCUS at scale. I agree with my hon. Friend the Member for Middlesbrough South and East Cleveland (Luke Myer) about the need to capitalise on investment that we have already made, and to continue down that path by investing in these projects. In October 2024, just a few months after we took office, we made a significant funding commitment of up to £21.7 billion over 25 years to kick-start the CCUS industry here in Britain. GGR projects have been able to apply to the expansion of the HyNet and East Coast clusters through the HyNet Track-1 expansion process, the Teesside selection process and the non-pipeline transport pathfinder process—all very catchy names. I can already confirm that the HyNet Track-1 expansion includes two GGR projects that are in the negotiation phase of that process. Fourthly, we are investing in innovation. For many of these technologies, there is research that still needs to be undertaken and there are breakthroughs that are waiting to be made. We have already invested over £80 million through the direct air capture and greenhouse gas removal innovation programme and the UK Research and Innovation funded greenhouse gas removal demonstrator programme and its co-ordinating hub. The carbon budget and growth delivery plan committed to launching a series of cleantech innovation challenges that target mission-critical innovation. These will set specific, measurable, time-bound goals for innovation, co-owned with industry, which will mobilise public and private sector investment and focus policy efforts on creating the necessary market pull for new technologies and, in the process, de-risking those investments into new innovations. That leads me to the fifth point about how we stimulate market demand. We want to engineer GGR projects to generate high-quality carbon credits that can be sold on high-integrity negative emissions markets, and so we will maximise the opportunity for the voluntary carbon markets to channel private finance into those GGR projects. At COP29, we launched six principles for voluntary carbon and nature market integrity to guide organisations into taking voluntary action towards nature-positive and net zero goals. When we consulted on those principles with stakeholders, they highlighted that, in order to unlock the full potential of the voluntary carbon market, there is a need for greater clarity on the definition of high-quality carbon credits and how credits could be used in corporate net zero claims. Alongside the Governments of Singapore and Kenya, we are leading development of the Coalition to Grow Carbon Markets to strengthen corporate demand for high-integrity carbon credits, and anyone and everyone is welcome to join that coalition. Our long-term ambition is for a competitive negative emissions market, underpinned by demand in the carbon market and the UK emissions trading scheme. We have signalled our intention to include GGRs in the UK ETS. Last summer, the ETS authority published a response to the consultation on the inclusion of GGRs in the ETS, setting out further details on how we will do this. Finally, we are considering the findings of the independent review into GGRs that we commissioned last year under my noble Friend and all-round GGR and general energy expert and nerd, Lord Whitehead, who did fantastic work. I can assure the hon. Member for West Dorset and the House that that review is certainly not gathering dust on my desk; I have been flicking through it far too much for it to be gathering dust. I can say to the hon. Gentleman that the review includes many interesting and useful conclusions. We are taking time to go through them in detail, but we aim to publish the response this month. I am sorry that that is not quite an exact date, but I hope it is close enough. I hope that the steps that I have outlined today will reassure the House that this Government take the future of GGRs extremely seriously. We know that these technologies will be essential to reducing our emissions while growing the economy on the road to net zero by 2050, and that is why we are acting now. I want to conclude by coming back to the point where the hon. Gentleman started. It is absolutely critical that we rebuild, where we can, the consensus on acting on the most existential crisis that this planet faces. The climate crisis is not some future threat that we can have a theoretical debate about now and worry about later; it is a very real and pressing threat, and GGRs will play a really important part in addressing it. The Government are determined to make that happen, and there is an economic opportunity if we get this right as well. I absolutely commit to working with the wider industry, with the hon. Gentleman and with everyone else who has an interest in this fascinating subject in order to make this work.

  • 7 Jul 2026 · Draft Contracts for Difference (Definition of Eligible Generator) (Amendment) Regulations 2026 · Hansard source
    More

    I beg to move, That the Committee has considered the draft Contracts for Difference (Definition of Eligible Generator) (Amendment) Regulations 2026. Thank you, Mr Wishart. Not willing to be half jacket on, half jacket off during my speech, I will continue as I am at the moment, but it is a genuine pleasure to serve under your chairship for the first time. The contracts for difference scheme is the Government’s primary way to incentivise low-carbon capacity in the electricity system. The draft regulations change the scheme’s eligibility criteria to include the lifetime extension of nuclear plants. Nuclear power is expected to play a key role in the UK’s future energy system. By generating baseload power in the UK, nuclear energy can complement renewable sources, helping to maintain price stability for consumers and reduce our dependence on fossil fuels. It also lessens our reliance on imports from overseas, strengthening our energy security. However, the UK’s present operational nuclear fleet, including the four advanced gas cooled reactors and Sizewell B, the UK’s only pressurised water reactor, are due to begin decommissioning in the coming decades; this means that around 15% of our current electricity generating capacity could be lost by 2035. While the Government continue to take forward the wider nuclear programme through Sizewell C and through the Great British Energy nuclear small modular reactor programme, we should also make sure that suitable mechanisms are available to support continued generation at existing nuclear stations, where financial support is necessary and likely to represent value for money. In the absence of that support, nuclear power plant operators may choose not to make the investment necessary to extend the operational lifetime of the stations. Before speaking to the provisions in more detail, I will set out some background to the contracts for difference scheme. As I said, that is the Government’s main mechanism for supporting low-carbon electricity generation across Great Britain. Under a CfD, the generator is paid a fixed price for electricity generated across the lifetime of the contract. It sells the electricity it produces into the wholesale market, and when the wholesale price falls below the strike price the difference is received in payments from the Low Carbon Contracts Company. Where wholesale prices rise above the strike price, the generator is required to make up the difference in payments to LCCC. Where the LCCC makes difference payments to the generator, these are funded through a statutory levy on licensed electricity suppliers, and are therefore passed on to households and businesses through electricity bills. The CfD mechanism is central to delivering the Government’s objective of a fully decarbonised power system while securing value for money. It protects consumers when electricity prices are high and gives generators income stability over the duration of the contract. For example, had Hinkley Point C been operational during the last energy crisis, consumers would have saved around £5 billion. The draft instrument before us today amends the Contracts for Difference (Definition of Eligible Generator) Regulations 2014 so that the Government have the option to use the CfD mechanism to support the continued generation of electricity at existing nuclear power stations. Nuclear energy is already eligible for CfD support for new-build capacity, with a CfD having been taken forward for the construction of Hinkley Point C, but nuclear stations seeking to undertake refurbishment in order to extend their operational lifetime are not currently eligible. Broadening the eligibility criteria in this way allows existing nuclear capacity to continue to generate low-carbon electricity over extended operating lifetimes, with support under the CfD where it is judged safe and economical to do so. The Government’s assessment is that nuclear lifetime extensions can provide value for money for consumers, given that lifetime extensions will be considerably cheaper than building new generation. Modelling indicates that extending nuclear plants lowers overall electricity system costs compared with other low-carbon routes to net zero. It is important to state that the draft instrument does not in itself commit any support; nor does it guarantee a CfD for any particular project. Its purpose is instead to allow the Government to consider CfD support for lifetime extension projects for nuclear. Any decision to award a CfD will be subject to all relevant approvals, including value for money tests, and will be announced in due course. The draft regulations widen the eligibility criteria for contracts for difference, so that existing nuclear plants can qualify for support for lifetime extensions. It strengthens our security of supply by enabling access to financial support where needed to sustain electricity generation from existing nuclear infrastructure. That means low-carbon baseloads can remain on the grid without the higher costs and longer delivery times associated with new build. I commend the draft regulations to the Committee.

  • 7 Jul 2026 · Draft Contracts for Difference (Definition of Eligible Generator) (Amendment) Regulations 2026 · Hansard source
    More

    I repeat these points regularly, but the shadow Minister, the hon. Member for West Aberdeenshire and Kincardine, often talks about his party’s “intention to do”, “ambition to do”, “we aimed to do”, but in 14 years the Conservatives did nothing to build any new nuclear, and that is the record he has to defend. Intention is all well and good, but delivery is what this Government are focused on. We have not ruled out new gigawatt-scale nuclear, but we want to look at it in the context of the future system. That is partly about what the strategic spatial energy plan looks like, but it is also about learning from the deployment of small modular and advanced modular reactors, which we will roll out in due course, and things like the measures we have taken to produce a new regulatory framework, so that we get private sector interest in building nuclear—the Centrica X-energy project in Hartlepool being a good example. It is possible we will have a much more developed approach and innovation in shaping the future nuclear fleet; it might not require a gigawatt-scale project, but we have not ruled it out and it continues to be something we will consider. The hon. Gentleman asked about the CfD itself. As I said, this set of regulations before us today does not agree to any particular CfD, but he is right to point out the value for money point. Any specific contract we looked at would be subject to subsidy control regulations, assessing first of all whether that support is absolutely necessary for the lifetime extension to continue, whether it is proportionate, and the value for money for consumers point which is really important. We will look at that very closely, but as he rightly says there are examples around the world of really significant lifetime extensions to fleets which could give us decades’ more nuclear power at much lower cost than the cost of rebuilding. To the Liberal Democrat spokesperson, the hon. Member for South Cambridgeshire, I will just say that I agree completely that the future of our energy system in terms of security and value for money is a mix of nuclear and renewables, as well as everything else we are doing around storage and investing in the grid. This instrument is a hugely important step in maintaining the fleet we have at the moment for a bit longer while we build the generation that comes next, and I commend it to the Committee. Question put and agreed to.

  • 7 Jul 2026 · Topical Questions · Hansard source
    More

    I suspect that in the coming days England fans will learn a lot from Norway in something else. On the serious point that the hon. Member raises, we should first recognise that Norway took a different approach to extraction from the North sea 60 years ago, and it has continued to do that over its 60 years of extraction from the North sea. Secondly, we are not turning off the taps in the North sea. We have said that we will introduce transitional energy certificates to allow new production tied back to existing fields.

  • 7 Jul 2026 · Topical Questions · Hansard source
    More

    First, we are delighted to be building the first long-duration energy storage in Britain in 40 years, including pumped hydro storage projects that will help us store renewable energy for when we need it. Secondly, there will be local benefits from that and I do not agree with the hon. Gentleman’s point about jobs. These are big construction projects and there will be jobs relating to running them afterwards. However, I will look further at his point on community benefits, because the community should benefit from such projects being built.

  • 7 Jul 2026 · Topical Questions · Hansard source
    More

    I love Bellshill, and it was a pleasure to visit the other day to see this fantastic facility opening just across my constituency boundary. More than 300 wind turbines are being maintained and operated from the facility. That is a good example showing that the clean energy mission is about not just the renewables being deployed, but the jobs that go with it in communities like my hon. Friend’s.

  • 7 Jul 2026 · Topical Questions · Hansard source
    More

    First, just to be clear, we are not abandoning at all the idea that we should put solar on as many car parks as possible and encourage the creation of car ports, so that there can be solar panels on the roof. That is brilliant, and we should see much more of that. We consulted on whether there should be one mandatory solution for the whole country, and the consultation responses, which we take heed of, suggested that was not the right way to go. That does not mean at all that we are not hugely ambitious about solar on car parks.

  • 7 Jul 2026 · Topical Questions · Hansard source
    More

    Yes, I completely agree. I am sure that if my hon. Friend’s local authority is listening, it will hurry up and make those decisions. We also want the process to be more standardised across the country, so that community projects like hers can learn from others who have done the same, and so that we can speed up the whole process.

  • 7 Jul 2026 · Topical Questions · Hansard source
    More

    We take those issues seriously across the energy resilience and security piece. It is for individual developers to look at their individual sites and ensure that they comply with the regulations that are in place. We are also looking at what more needs to be done, because the security and resilience of all our energy infrastructure has never been more important.

  • 7 Jul 2026 · Topical Questions · Hansard source
    More

    The hon. Lady could go on all day reading out the things that this Government are already going to do. We want to see much more community ownership, because it matters to us that communities own their future energy, and that people keep the wealth in their communities to invest it in the things that they think are important, because they know their community best. There is a whole series of actions that previous Governments have not taken that would have made that possible. We are going to clear that away and make it possible for communities to own their energy, and we have put £1 billion into that. I always welcome the Lib Dems’ support for what we are doing.

  • 7 Jul 2026 · Energy Security · Hansard source
    More

    Great Britain’s energy system is robust and reliable, and delivers 24/7 for households and businesses across the county. However, in an era of geopolitical uncertainty, we need to do all that we can to strengthen our energy security here at home. The answer is for us to move away from fossil fuels, which we cannot control, to deliver renewables and nuclear here at home, which we do control.

  • 7 Jul 2026 · Energy Security · Hansard source
    More

    The hon. Gentleman knows that I cannot comment on two specific projects that are under a process at the moment, but on his general point, let me say that oil and gas continues to come out of the North sea—24/7, right now. It is playing a part in our energy security, but we have also been a net importer for decades, so it can never be the only answer. This is about how we deliver oil and gas from the North sea for many decades to come, and build up what comes next. There is huge potential for his constituents in offshore wind in particular, which his Front Benchers refuse to back. He should tell his constituents why he supports a party that is against the new jobs of the future, which would help his constituents and those right across the north-east of Scotland.

  • 7 Jul 2026 · Energy Security · Hansard source
    More

    The shadow Secretary of State has made some very serious claims. If she has that information, she should share it with the Department. [ Interruption . ] Well, she has shared it in the House of Commons. She should also share the detail with us. No, I do not take back—and I am sure that my right hon. Friend the Secretary of State does not take back—the idea that the shadow Secretary of State has been scaremongering, because she has continued to do so; even though the National Energy System Operator has continued to meet the demand that is necessary for all consumers in the country, she continues to peddle nonsense on social media. I think she should look at some of the facts before she does that. The heatwave saw no impacts on consumers, and demand was met at all times. We have a robust and resilient energy system; if she looks at the data, she will see that that is being delivered day after day.

  • 7 Jul 2026 · Energy Security · Hansard source
    More

    A shout-out to the energy and environment parliamentary knowledge scheme—there are some Members of this House who would really benefit from gaining some of that knowledge, I think. I thank my hon. Friend for raising the issue—I heard a lot of cheers from the Labour Benches. Geothermal has an important part to play and we have to accelerate the potential of all low-carbon energy sources, including geothermal. We will continue to look into the issues around planning, but we are also trying to build out heat network infrastructure that can be used to supply affordable low-carbon heat with a range of technologies, including geothermal, so that we can utilise that to deliver heat to consumers across the country. We will continue to look at what more we can do.