Emma Hardy MP: speeches

322 published records · newest first.

Speeches

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    I thank all hon. Members for their thoughtful contributions during this debate and the careful consideration of the amendments tabled to clause 4. We are in danger of having a bit of a love-in with so much agreement in this room. I turn first to amendment 26, which was tabled by the hon. Member for Westmorland and Lonsdale. I was genuinely really pleased to see clause 4 added on Report in the Lords, as a result of the collaborative cross-party approach to strengthening the Bill so that it further encourages greater use of nature-based solutions by water companies, and I appreciate the kind comments from the Opposition spokesperson, the hon. Member for Epping Forest. This is why clause 4 requires sewerage undertakers to address, in their drainage and sewerage management plans, the use that is to be made of nature-based solutions in their networks. Sewerage undertakers already have existing obligations under section 94A of the Water Industry Act to address the sequence and timing for the implementation of measures proposed in their drainage and sewerage management plans. We believe that these obligations sufficiently require sewerage undertakers to address the relative prioritisation of the proposed measures in their plans. Nature-based solutions are one of a diverse range of potential solutions to complex drainage and sewerage issues. Clause 4 will ensure that sewerage undertakers highlight the proposed role of nature-based solutions within their network. It is right that undertakers have due flexibility to consider the full range of solutions available to them and to work with stakeholders to identify the right solutions. As much as I love nature-based solutions—and so does everyone in the room, it appears—I am sure we all accept that it is not appropriate to prioritise nature-based solutions ahead of other available options in every circumstance. We believe, however, that the provisions in clause 4 will have sufficient positive effect in supporting greater exploration and development of nature-based solutions without posing operational challenges for the sewerage undertakers. On that basis, I ask the hon. Member for Westmorland and Lonsdale to withdraw his amendment. Moving to new clause 5, which the hon. Member for Epping Forest tabled, I take this opportunity again to agree and emphasise that the Government think that nature-based solutions are critical to ensuring that we have a resilient and sustainable sewerage system. I am therefore delighted to inform the House that we have recently seen the regulator doing just that. In its final determinations for the 2024 price review, Ofwat has set out an allowance of £3 billion for water company investment in nature-based solutions and biodiversity. That includes £2.5 billion to reduce storm overflow spills through green solutions. However, the Government have noted the concerns and amendments in the other place, which is why we introduced our amendment to place a new requirement on sewerage undertakers to support the greater use of nature-based solutions, which now forms clause 4. Clause 4 will ensure that nature-based solutions are considered from the start of investment planning and decision making as a solution across multiple risks, including pollution, flooding and drainage. I trust that the hon. Member is therefore reassured that his new clause has already been provided for. On that basis, I ask him not to push his new clause to a vote. Although I have outlined some of the merits of clause 4, I will briefly reiterate why this Government consider the clause to be an essential part of the Bill. Nature-based solutions are vital to protecting the environment and the wider water system, as well as delivering co-benefits including protection from flooding for the public and enhancing the natural environment. I concur with the comments made about flooding by the Opposition spokesperson. Clause 4 will drive further exploration and development of nature-based solutions, and will require undertakers to be transparent as to how they have deployed, or propose to deploy, nature-based solutions within their drainage and sewerage networks. Compliance with that duty will be monitored by Government and regulators. Sewerage undertakers will also be required to conduct public consultations on their drainage and sewerage management plans, which will allow the public to scrutinise the plans and propose changes. Therefore, to help realise the Government’s desire to see further development of nature-based solutions by sewerage undertakers, I commend clause 4 to the Committee.

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    I thank all Members for their contributions to the debate on clause 3. I reiterate my promise to provide a factsheet and information about the numbers we have used. We have had an interesting debate about the different types of monitors. To clarify, we have emergency overflows, storm overflows, water quality monitors, event duration monitors and volume monitors, which we have discussed. We will make sure that the factsheet provides clarification so that we are all on the same page and understand the debate clearly. Putting all that to one side, I think we ultimately all agree that it is important to better understand the frequency and duration of discharges from all the emergency overflows. We all think we need to improve transparency and inform investigations by the regulators into potential non-compliance. Combined with the equivalent duty for storm overflows, which has just come into force, clause 3 will ensure that all sewage overflows on the network are monitored. That will enable regulators and, importantly, the public to see, in near real time, when a discharge from any overflow has occurred and how long it lasted. Water companies will use that information to prioritise investment to mitigate the impact of the most polluting overflows, as guided by the regulators. We have discussed our concerns about volume monitors being more difficult and costly to install. I gave a rather garbled explanation of the difficulty owing to the pipework in the majority of overflows requiring modification. As I said, I will provide further information on those numbers. Such a large programme of work would take much longer than 12 months. We do not think that this added cost is proportionate to the additional value that volume information would provide, especially given that volume information alone does not provide a comprehensive account of the impact of a discharge—measurement of the water quality is required for that. To repeat a point, I do not want to be a Minister in a few years’ time who has perfected the art of monitoring and done nothing to deal with the causes. That is why the water companies will begin installing continuous water quality monitors for storm overflows, as set out in the price review ’24, to provide further information on the impact of sewage discharges on water quality. New clause 25, tabled by the hon. Member for Westmorland and Lonsdale, would require capacities for each sewage treatment works and pumping station to be calculated. That is unnecessary because that information is already included in environmental permits and available from the Environment Agency’s public register. The new clause also proposes a general duty for water companies to collect data relating to their performance operating a sewerage system. We do not believe that that broad duty adds any meaningful requirement on water companies beyond their existing duties through the environmental information regulations. On that basis, I commend clause 3 to the Committee and ask the hon. Gentleman not to press his new clause. Question put and agreed to. Clause 3 accordingly ordered to stand part of the Bill. Clause 4 Nature-based solutions

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    I thank the hon. Member for Beaconsfield for tabling amendment 4, which seeks to make a failure to publish discharge data from emergency overflows in near-real time a criminal offence. I wholeheartedly agree that it is vital that regulators have a clear means of ensuring that water companies comply with this duty. However, clause 3 already ensures that the duty is enforceable by Ofwat under section 18 of the Water Industry Act 1991, which provides a range of tools—including significant fines—for Ofwat to bring companies into compliance. Changing the provision to a criminal offence might slow down enforcement, because criminal prosecution is typically slower than enforcement by section 18 of the 1991 Act. In addition, we do not believe that in this case it would be proportionate to create direct criminal liability for a chief executive, particularly the potential sanction of imprisonment, because the large number of emergency overflows operated by companies, with each company operating in a different situational context, means that it is unreasonable to hold a single person to account for full compliance with the duty. By making changes such as introducing bonus bans and provisions to support prosecuting executives for obstructing the regulator, the Bill already strengthens provisions to hold executives to account for wrongdoing.

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    Before I start my response to this group, I just want to note that there has been considerable discussion on the monitoring of the volume of discharges during this debate. In the interests of time, I will respond to those points when we debate amendment 13 next week, if that is agreeable to everyone. I thank hon. Members for tabling the amendments relating to pollution incident reduction plans. On amendments 23 and 25, tabled by the hon. Member for Westmorland and Lonsdale, we agree that companies should seek to reduce the impact of pollution incidents in their pollution incident reduction plans. That, of course, is the core purpose of the plans. That is why the clause requires water companies to set out the measures they will take to reduce the frequency and seriousness of the pollution incidents and their causes. The impact of a pollution incident on people and the environment will be taken into account when the undertaker determines how serious it is, as required in the pollution incident reduction plan. In fact, it would be impossible to determine whether something was serious without looking at the impact the pollution was having. These amendments are therefore not needed, and I ask the hon. Member not to press them. I thank the hon. Member for Epping Forest for tabling amendment 9. The Government agree that national parks form a vital part of our environmental heritage and must be protected. For that reason, the Government have committed to strengthening the statutory purpose of national landscapes and national parks to give them a clear mandate to recover nature. We will also strengthen through new regulation the role that public bodies, including water companies, must play in delivering better outcomes for nature, water, climate and access to nature in these special places. Ofwat made significant funding available to water companies in the price review for 2024 to support work to reduce pollution in national parks. As an example, Ofwat approved four storm overflow schemes related to improvements in the Windermere catchment, with potential to include 12 additional schemes via the large scheme gated process. We do not believe it is necessary to include a specific reference to national parks in clause 2. All sites, including national parks, are already in scope of the duty. Creating a statutory hierarchy of priority sites risks deprioritising other important areas such as bathing and shellfish waters. For those reasons, the Government will not support the amendment. I thank the hon. Member for Westmorland and Lonsdale for tabling amendment 24. The Government agree that nature-based solutions are an essential tool for tackling the root cause of sewage pollution, while also delivering significant ecological benefits. That is why, in line with the Government’s strategic policy statement, Ofwat has allowed companies to increase the use of nature-based solutions with £3 billion-worth of green schemes in water companies’ final determinations for price review ’24. Although the benefits of nature-based solutions are clear, we believe their use is better supported through drainage and sewerage management plans than through pollution incident reduction plans. Pollution incident reduction plans are intended to set out the steps that companies intend to take to reduce the frequency and severity of pollution incidents. These issues are often best addressed by monitoring and maintenance measures such as burst pipe detection, checking pumps and re-lining sewers. Drainage and sewerage management plans are intended to address the resilience of the whole sewerage network over a long period of time. That is why the Government have introduced a duty through the Bill for sewerage undertakers to consider nature-based solutions in their drainage and sewerage management plans. That will ensure that nature-based solutions are considered at the very start of the investment planning, increasing their development and potential future delivery. The amendment is therefore not needed, and I ask the hon. Member not to press it. Regarding amendment 6, which was tabled by the hon. Member for Epping Forest, I agree that improving transparency and accountability is key to the success of pollution incident reduction plans. That is why clause 2 already requires water companies to publish the implementation report alongside the pollution incident reduction plan. Details of where and how to publish the plan and the implementation report, and in which format, may change over the years as technology and best practice evolve, so that is best addressed in the guidance that the Environment Agency is producing about how to fulfil the duty.

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    The hon. Member is pre-empting my responses to the next amendments on transparency, which I am just about to turn to. Before we move on from volume, I re-emphasise the point. This is something that I looked at seriously because a number of colleagues have spoken to me about it, so I really do not want hon. Members to feel like it has been dismissed out of hand—I did look at this seriously. One of the other points made to me was about lots of the pipes being different sizes. If we are going to be able to calculate the volume, we have to be able to calculate the size of the pipe, which might require standardising the size of all pipes to work out the volume coming through them, so we can measure how much is coming out at one moment. That is where we get to the £6 billion figure; it is not just the cost of putting the monitors on but ensuring that, if we are measuring the amount of sewage flowing past something, we can understand the size of it. The hon. Member for Witney is looking at me and I can see that I have work to do to convince him of this. I am probably doing a complete injustice to the person who explained this all to me, but I will ensure that the hon. Member gets a proper explanation. The upshot of the conversation was that this is going to be really expensive, and what we all want to know is: how damaging is what is coming out of those pipes to our environment? That is why we are focusing on water quality. [Interruption.] I have had inspiration from behind me and an answer to the question of when continuous water quality monitoring will be rolled out. They have requested to begin installing continuous water quality monitors at 25% of storm overflows and sewage treatment works outlets at price review 2024. The sites selected for the first stage of roll-out have been prioritised to include sensitive sites such as chalk streams.

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    I am just about to finish. On the basis of what I have said, I hope that clause the clause can stand part of the Bill.

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    I want to make sure that I am not giving the hon. Gentleman inaccurate information, so I will find out the answer to his question and return to it, if that is okay. I do not want to give him the wrong information. The main point we are making is that it is not the volume that is having the impact; it is the toxicity. We think that, by focusing on measuring water quality, we can accurately see the damage being done to our environment by what is being discharged, and I think that is the point. If we are choosing where to put the monitors, we think that focusing on water quality and how damaging it can be is more important than focusing on how much there is.

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    I am obviously a bit of a fangirl of Feargal Sharkey, not least because of his musical career before entering the field of environmental campaigning. We do not expect this measure to materially impact on court case numbers. The intention is to deter offending. Not all cases will go to the Crown court, but it is right that that is a possibility. Obstruction of the Environment Agency’s emergency powers, under section 108 of the Environment Act 1995, is already triable in the Crown court. The EA will consult on updating the enforcement sanctions policy to ensure that that is absolutely clear. Although this is not a new offence, we are talking about changing the maximum penalty because of the justice gap that I have mentioned. Previously, it was punishable only by fine and heard only in the magistrates court, and we are moving it to be punishable in the Crown court and including a prison sentence. I am pleased that there is lots of agreement on the importance of the clause. We are talking about something very serious: obstructing the Environment Agency or the Drinking Water Inspectorate in going about and collecting the evidence that they require. This is a serious matter, and it deserves a serious penalty. I thank hon. Members for their views on the clause, but nothing that has been said detracts from the importance of addressing the justice gap. I am pleased that there is agreement, which has, on occasion, has been exploited by water companies. I commend the clause to the Committee. Question put and agreed to. Clause 5 accordingly ordered to stand part of the Bill. Clause 6 Civil penalties: modification of standard of proof Question proposed, That the clause stand part of the Bill.

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    I am very happy to give a breakdown of the numbers that we have worked out. To reiterate the point I made before the intervention, that is why the Government believe that it is the measurement of water quality that is required. Water companies have been instructed to begin installing continuous water quality monitors for storm overflows and waste water treatment works from April 2025 onwards, so they have been told to put in those water quality monitors from April 2025. That will provide further information on the impact of sewage discharges on water quality. On that basis, I hope that the hon. Member for Westmorland and Lonsdale will see that amendment 13 is not needed and feels able to withdraw it.

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    I think that might be really helpful. It has been an interesting but slightly muddled conversation. We were going to produce a factsheet to explain the difference between emergency and storm. Maybe we can include as much information as we can for Committee members by the end of Committee or before Report, if that does not put too much on my hard-working officials. On the annual data being analysed, the proposed amendments are unnecessary and I ask hon. Members not to press their amendments. On amendment 16, which was also tabled by the hon. Member for Westmorland and Lonsdale, and which is about the speed of delivery, the need to deliver the installation of monitors on emergency overflows must be balanced with practical constraints and with due consideration for the cost of rolling out so many monitors, especially as those costs are ultimately passed to consumers through water bills. Water companies have been instructed to install monitors at 50% of emergency overflows by 2030. This represents a doubling of the previous Conservative Government’s target of 25% of emergency overflows monitored by 2030. The Environment Agency will agree with water companies which emergency overflows will have monitors installed over the next five years based on priority areas, such as those that impact designated bathing and shellfish waters. As set out in the impact assessment, we expect the roll-out of monitors at emergency overflows to cost £533 million over a 10-year period. We believe that pace of roll-out strikes the right balance of recognising the urgency—this Government are doing double what the previous Government promised—while ensuring that companies have the capacity to progress other improvements and balancing customer bill impacts. To speak frankly, it is very important to monitor, but it is also very important to fix the causes of some of the problems that we see. There is always a balance between monitoring and fixing the problem, and we believe that we have got that balance right. Requiring a faster roll-out of monitors could undermine the delivery of other improvements that water companies must make in price review 24—I would not want to be in a situation at the end of the price review where we monitor everything and fix nothing. That includes upgrades to wastewater treatment works and sewerage networks to reduce sewage discharges from storm overflows. Where companies can move further and faster to achieve the roll-out of monitors at emergency overflows, they will of course be encouraged to do so, but we cannot accept this amendment to require water companies to install all monitors within 12 months. I therefore ask the hon. Member to withdraw it.

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    I thank the hon. Member for Beaconsfield for proposing amendment 10, which seeks to make it an offence for sewage undertakers to use an emergency overflow in areas used for aquatic sports. I will mention how much I enjoyed meeting the Clean Water Sports Alliance just last week to hear about its fantastic work to get us all up, out and active, although I have so far resisted the temptation to don a wetsuit and join in. I agree that it is vital for us to reduce the impact of sewage pollution, so that our children and their children can make the memories that we did enjoying our waterways. However, we do not believe that the amendment is necessary. It risks duplicating existing requirements to limit pollution for emergency overflows, as well as protections for bathers that are already in place. Emergency overflow discharges are permitted only in very strict circumstances and as a last resort, such as in the event of mechanical breakdown or a downstream blockage. That factsheet on the different circumstances might help. Should an emergency overflow discharge occur outside permit conditions, the Environment Agency is able to take robust enforcement action, including fines and criminal prosecution. The measures in the Bill will increase transparency around emergency overflow discharges, shining a light on where they should not be happening.

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    I thank the hon. Member for Epping Forest for his contribution to the debate. I think the point my hon. Friend, and friend, Baroness Hayman made in the Lords is that we do need some flexibility, and that it would be inappropriate to set out the details of implementing these powers in the Bill, because that would result in a fixed power that would not be adaptable to the industry’s circumstances. We would like to be able to continue to adapt it. I think the shadow Minister is trying to make sure that we set things in the right way and at the right level. That is why Ofwat will be doing a consultation. We want the level to be a deterrent rather than something that water companies can easily dismiss, but it needs to be set at the right level. It is important that that is done properly and through consultation. I am grateful that everybody supports the clause. By strengthening the powers of the water industry regulators, we will drive improved performance in the sector. Question put and agreed to. Clause 6 accordingly ordered to stand part of the Bill. Ordered, That further consideration be now adjourned. —(Jeff Smith.)

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    Thank you, Mr Vickers, for the opportunity to speak on the importance of clause 5. The clause strengthens the penalty for obstructing the investigations of the Environment Agency, Natural Resources Wales and the Drinking Water Inspectorate. Obstruction of investigations by the regulators is already an offence, but that has not stopped companies blocking the regulators’ investigations. In 2019, the Environment Agency prosecuted a number of individuals at Southern Water for removing evidence from the possession of officers. I am sure Members will agree that such behaviour is unacceptable. Currently, the offence of obstructing the Environment Agency and Natural Resources Wales’s investigatory powers—under section 108 of the Environment Act 1995—is punishable only by a fine, and can only be heard in the magistrates court. There is also no mechanism for prosecuting executives where obstruction of those powers occurs under their guidance. The offence of obstructing the Drinking Water Inspectorate is already triable in the Crown court. That too, however, only carries a maximum penalty of a fine. I am sure Members will agree that it should never be preferable to accept a fine rather than face the full consequences of lawbreaking, and where lawbreaking occurs with their involvement, executives should be held accountable. Clause 5 makes the offence of obstructing the Environment Agency and Natural Resources Wales’s powers under section 108 of the 1995 Act triable in the Crown court. It expands the maximum penalty for obstructing Environment Agency, Natural Resources Wales and Drinking Water Inspectorate investigations to be up to two years’ imprisonment for conviction on indictment. Clause 5 will address a notable justice gap and further deter the offence of obstruction. In turn, it should better enable our regulators to carry out their investigations uninhibited and hold water companies to account accordingly.

  • 9 Jan 2025 · Water (Special Measures) Bill [ Lords ] (Second sitting) · Hansard source
    More

    I think the hon. Gentleman is probably moving on to amendment 16 with his point about the speed at which these were being rolled out. We were discussing amendments 13 and 14. That is where the confusion lies in this conversation. I will address the points about speed when we move on to amendment 16 —it is all to come. I turn now to amendments 3 and 15, which were tabled by the hon. Member for Beaconsfield and the hon. Member for Westmorland and Lonsdale respectively. Clause 3 already requires companies to publish information on discharges in a readily accessible and understandable format. That includes information on the occurrence, location and start time of the discharges, which must be published within an hour of the discharge starting. To meet this requirement, water companies will install monitors that have telemetry technology to communicate discharges as they occur. To the point the hon. Member for Broadland and Fakenham made, that information cannot be falsified. It is not based on someone coming; it is automatic communication. Those requirements are the same as those for publishing storm overflow discharges, which is now a statutory duty enforced by Ofwat. Water companies have already published individual maps for their regions to show storm overflow discharges in near real time. In addition, Water UK launched a national storm overflow hub in November last year to centralise all discharge information from water companies on a single national map. We expect that a similar approach will be taken for emergency overflows. If further direction for companies on how to approach the duty is needed, that can be more appropriately addressed through guidance. Furthermore, validated historical information on discharges from emergency overflows will be available through annual returns published by the Environment Agency. Those will allow for long-term trends in annual data to be analysed. If there are any specific requests from groups or organisations about how they would like to see information, they are of course welcome to communicate that to me.

  • 6 Jan 2025 · Flooding · Hansard source
    More

    I thank the hon. Gentleman for highlighting the impact that flooding has, not just on homes but on medical facilities. It is important, but we need to look in the round at what makes the most difference in improving flood resilience within a community. One of the things I have mentioned to many other Members is the build back better scheme, under which there can be an extra £10,000 to make properties more flood resilient. It might be good to have a conversation about that in terms of other houses in the local area, so that we can improve property flood resilience. Flooding will not be solved by one thing; we need to look at as many different things as we can and accumulate them to make the biggest impact.

  • 6 Jan 2025 · Flooding · Hansard source
    More

    I share my hon. Friend’s upset about the fact that this issue is not being taken seriously enough by Southern Water, but having known her for a very long time, I have no doubt that if there is someone who will make that company listen, it is her. I am happy to support her with that.

  • 6 Jan 2025 · Flooding · Hansard source
    More

    The right hon. Gentleman is always welcome to urge me to do many things. His proposal on how the Environment Agency works with local parishes is an interesting one, and I would be happy to hear more of his thoughts on it. To reassure people about new homes, we have committed to building more high-quality, well-designed and sustainable homes, and to ensuring that they do not increase flood risk and are not at risk of flooding. If alternative sites are not available and developments need to be in locations where there is a risk of flooding, they must be flood resilient and resistant for their lifetimes, and must not increase overall flood risk.

  • 6 Jan 2025 · Flooding · Hansard source
    More

    I thank my hon. Friend. I am sure her constituent has done an incredible job—the flood groups have done an amazing job—and I understand why she must be feeling so exhausted. We have mentioned the impact that flood events have on people’s mental health. We want to look at areas at risk of repeated flooding in the flooding formula review to make sure that those areas are getting the support they need. The immediate post-flood situation is of course for MHCLG, but if I can help in any way she needs only to contact me.

  • 6 Jan 2025 · Flooding · Hansard source
    More

    Of course, where schemes are not working as effectively as they should—where there is room for improvement—this Government will make sure they do everything they can to improve things and make them better. I am happy to receive that communication.

  • 6 Jan 2025 · Flooding · Hansard source
    More

    My hon. Friend is very charming, which always makes it harder to say no. I would be happy to look into the scheme in more detail for him.

  • 6 Jan 2025 · Flooding · Hansard source
    More

    I thank my hon. Friend and congratulate her constituent who has managed to raise £5,000, which is incredible. I am at heart an optimist and always see the bright side. The silver lining in the clouds has definitely been seeing communities coming together and people working together despite the horrible situations they have been facing. I am working on the issue of creating more internal drainage boards at the moment. I am sorry that I cannot give an exact timeline, but I can tell her I am working on it right now.

  • 6 Jan 2025 · Flooding · Hansard source
    More

    I thank the hon. Lady for her question. That is a really important question because, particularly today and in the past couple of days, many of our highways have been impacted. Indeed, as has been mentioned, the railways have also been impacted. I found it more difficult to get here, as I know have other hon. Members. She is quite right that we should look at working together, and that may be one of the actions we look at in the flood resilience taskforce.

  • 6 Jan 2025 · Flooding · Hansard source
    More

    I thank the hon. Gentleman for his question, and I am sorry to hear that the experience of the Environment Agency has not been what he expects. I would be more than happy to put him in touch with the EA area director, so that they can have a conversation and work out how to improve the situation. Urban flooding is one of the reasons we want to look at what are called SUDS—sustainable urban drainage systems—and how we can integrate more of those into our communities to help deal with some of the problems with surface water flooding.

  • 6 Jan 2025 · Flooding · Hansard source
    More

    I share my hon. Friend’s thanks to the Environment Agency. It does an incredible job and was out there working new year’s eve and new year’s day—not celebrating like many of us, but out helping and supporting. I am pleased to hear that positive story from her constituency.

  • 6 Jan 2025 · Flooding · Hansard source
    More

    I thank the hon. Gentleman; that was another interesting and thoughtful question. I am happy to look into this in more detail for him, because if there are rules and regulations that are not working, as a new Government we do not need to keep them. If they are not working, let us change things and make things better. The hon. Member should send me the information and I can have a proper look at it.

Published records only — not a full account of an MP’s work. How we work →